Thursday 21 December 2017

Week11

This week I haven't done enough work on my project as I should have done or planned in my head, the real reason for this is because I was generally just choosing to do other things or not motivated enough to do work. The logo and shopping cart were two things which were meant to be embedded into the website but I still haven't completed them yet. I had made screen prints of the code which was done in Notepad++ plus the website itself to show the progress of how it is going along with the gradual editing done. Under the screen prints of the starter coding work I have described what it is I'm doing and why I am doing it. Apart from that nothing further has been done on the project at all, for the next week I aim to do more project associated work. The stuff I plan to do for next week are to sort out the logo design and have a shopping cart, both of these need to be coded into the website and another thing I can do is choose a website background I like along with text fonts and colours for them. Another thing I need to do is keep showing the screen prints along with their descriptions in the documentation and fill out anything else in the documentation which may be outstanding. Aim for next week is work more.   

Tuesday 12 December 2017

Week10

Last week was Week10, in that week I only did basic stuff like making a start on coding the website. The coding which I have started is just simple such as header and footer parts plus the background colour. Next week I will officially put the rest of the colour scheme in the website along with changing the colour of text(s) and possibly deciding on fonts.I have also been debating what I want to be my logo for this website but I am thinking I am going to stick to a logo of a dress like I have shown in my website samples because it is girly and I like it. I have named the different pages on my navigation bar which HTML pages created for them but the content on the pages itself needs editing. Most of this is just the basic beginning of the website which doesn't seem like much but it's a start. I haven't made any changes to any of the content that is currently on the website template but this is something I can tackle in the following week and I can possibly make accounts. The content for these accounts can be added later on so I can have time to think about what I want to display, a logo is something else I need to make ASAP. I have been doing my project paperwork such as talking about the website samples and ghant chart notes. 

Monday 4 December 2017

Week9

Week9 is the recent week which has just passed by, in this week I began doing more work on the project such as checking that the website samples were complete to a reasonable standard ready to display in the presentation. The ghant chart was also another thing I was meaning to start but hadn't yet got to it due to other assignments taking first priority. Monday was the day of the presentation so i had to have that prepared, a start up of a ghant chart to show what I plan to do in these early stages. That day (Monday) everything for the presentation purposes was completed including delivering the presentation to my lecturer and the class members, my idea for my project was approved and has been given the go ahead. There were a few comments and feedback at the end of my presentation but I took it as constructive criticism, it wasn't criticising as such but it gave me a few ideas which weren't included on the website samples but can be added or be done straight in the coding part. During that day I watched other people's presentations and made plans for what work I would like to do on my project from 1st December 2017 onwards. That week I did no further work on the project even though I should have but next week it is.